Post Construction Cleaning Pricing: Price Each Phase From Its Hours

By Roger Ramey· Published · Updated · 10 min read· Every number shows its working

Short answer

Price post construction cleaning (construction cleanup) phase by phase. For each phase (rough, final, touch-up): sq ft ÷ your production rate for that phase = cleaner-hours; cost them at a loaded wage, add supplies and overhead, divide by (1 − margin). Add the phases. Example: a 3,000 sq ft new build, 20 cleaner-hours, prices at $1,150.77 before drive time.

On this page
  1. How do you quote a post construction clean?
  2. Post construction cleaning pricing calculator
  3. What does a construction cleanup consist of?
  4. Worked example: how much to charge for post construction cleaning of a 3,000 sq ft home
  5. Construction cleanup cost per square foot, phase by phase
  6. New construction cleaning prices vs renovation cleanup
  7. Why you cannot price it like a recurring clean
  8. Is post construction cleaning profitable? The overrun test
  9. Free calculator, spreadsheet or custom build?
  10. What to put in your post construction cleaning price sheet
  11. Step-by-step
  12. FAQ

How do you quote a post construction clean?

Quote it as separate phases, each priced from its own cleaner-hours, then add them. A builder's clean is not one visit: the rough clean, the final clean and the touch-up happen on different days and go at very different speeds.

  1. Cleaner-hours per phase = sq ft ÷ your production rate for that phase.
  2. Labour = cleaner-hours × loaded rate (wage × (1 + burden %)).
  3. Break-even per phase = labour + supplies + cleaner-hours × overhead per sellable hour.
  4. Price per phase = break-even ÷ (1 − margin).
  5. Job price = the phases added together, plus drive time for every trip.
  6. Price per sq ft = job price ÷ sq ft. A check, not an input.

Most results for this search quote per-square-foot ranges or other people's hourly rates. Those come from someone else's wage, speed and town. This page shows arithmetic you can check, and every input is an assumption to replace.

Assumptions used throughout: $18 an hour wage with 30% burden ($23.40 loaded); $29,040 of yearly overhead over 2 people × 220 days × 8 hours = $8.25 per sellable hour; a 35% target margin; a crew of two, priced in total cleaner-hours.

Post construction cleaning pricing calculator

Run the calculator once per phase. It opens on the rough clean of the 3,000 sq ft example; change the production rate and supplies for the final and touch-up phases, then add the three prices.

The same tool is on its own page as the free cleaning job price calculator. No signup, and your numbers stay in your browser.

What does a construction cleanup consist of?

Usually three phases, each with a different job and a different speed. Agree with the builder which ones you are quoting, because each is a separate trip and a separate bill line.

The three phases of a post construction clean (assumed rates, replace with your timed ones)
PhaseWhenTypical workAssumed sq ft per cleaner-hour
Rough cleanAfter the main trades finishRemove loose debris and packaging, sweep and vacuum, scrape obvious splatter500
Final cleanBefore handoverDetail every surface: dust from top down, inside cabinets, fixtures, windows and tracks, floors250
Touch-upAfter the punch listRe-clean areas trades went back into, final vacuum and wipe-down1,500

The final clean is the slow one: fine construction dust settles on every ledge and inside every cupboard. The rates in the table are placeholders, not measured speeds. Time your first few jobs phase by phase and replace them.

Debris removal is its own question. If the contract makes you haul it away, price the load as a separate line; the junk removal pricing guide shows how to cost a load.

Worked example: how much to charge for post construction cleaning of a 3,000 sq ft home

On this page's assumptions, a 3,000 sq ft new build is 20 cleaner-hours across three phases and prices at $1,150.77 before drive time, or $0.38 per sq ft.

Phase 1: rough clean

3,000 ÷ 500 = 6 cleaner-hours, with $60 of supplies (heavy bags, scraper blades, vacuum filters, all assumed).

Worked example: Phase 1, rough clean: 3,000 sq ft at 500 sq ft per cleaner-hour (assumed inputs)

Inputs (assumptions — replace with your own) and results
ItemValue
Workers (input)1
Hourly wage paid (input)$18.00
Labour burden % (input)30%
Materials (input)$60.00
Overhead for the year (input)$29,040.00
People in the field (input)2
Billable days a year (input)220
Target margin % (input)35%
Jobs a week (input)1
Area (sq ft) (input)3,000
Production rate (sq ft per hour) (input)500
Loaded labour rate (per hour)$23.40
Crew-hours6
Labour cost$140.40
Overhead per sellable hour$8.25
Overhead share$49.50
Break-even cost$249.90
Price to quote$384.46
Profit on the job$134.56
Price if you MARK UP instead$337.37
Margin you actually keep with markup25.93%
Lost per job by marking up$47.10
Lost per year by marking up$2,449.02
Hours on the job6
Price per sq ft$0.128
Break-even per sq ft$0.083

Computed with the same formulas as the free calculators on this site. Change any input in the calculator above to see your own numbers.

Phase 2: final clean

3,000 ÷ 250 = 12 cleaner-hours, with $45 of supplies. With two cleaners that is 6 hours on site, but you pay for all 12.

Worked example: Phase 2, final clean: 3,000 sq ft at 250 sq ft per cleaner-hour (assumed inputs)

Inputs (assumptions — replace with your own) and results
ItemValue
Workers (input)1
Hourly wage paid (input)$18.00
Labour burden % (input)30%
Materials (input)$45.00
Overhead for the year (input)$29,040.00
People in the field (input)2
Billable days a year (input)220
Target margin % (input)35%
Jobs a week (input)1
Area (sq ft) (input)3,000
Production rate (sq ft per hour) (input)250
Loaded labour rate (per hour)$23.40
Crew-hours12
Labour cost$280.80
Overhead per sellable hour$8.25
Overhead share$99.00
Break-even cost$424.80
Price to quote$653.54
Profit on the job$228.74
Price if you MARK UP instead$573.48
Margin you actually keep with markup25.93%
Lost per job by marking up$80.06
Lost per year by marking up$4,163.04
Hours on the job12
Price per sq ft$0.218
Break-even per sq ft$0.142

Computed with the same formulas as the free calculators on this site. Change any input in the calculator above to see your own numbers.

Phase 3: touch-up

3,000 ÷ 1,500 = 2 cleaner-hours, with $10 of supplies.

Worked example: Phase 3, touch-up clean: 3,000 sq ft at 1,500 sq ft per cleaner-hour (assumed inputs)

Inputs (assumptions — replace with your own) and results
ItemValue
Workers (input)1
Hourly wage paid (input)$18.00
Labour burden % (input)30%
Materials (input)$10.00
Overhead for the year (input)$29,040.00
People in the field (input)2
Billable days a year (input)220
Target margin % (input)35%
Jobs a week (input)1
Area (sq ft) (input)3,000
Production rate (sq ft per hour) (input)1,500
Loaded labour rate (per hour)$23.40
Crew-hours2
Labour cost$46.80
Overhead per sellable hour$8.25
Overhead share$16.50
Break-even cost$73.30
Price to quote$112.77
Profit on the job$39.47
Price if you MARK UP instead$98.96
Margin you actually keep with markup25.93%
Lost per job by marking up$13.81
Lost per year by marking up$718.34
Hours on the job2
Price per sq ft$0.038
Break-even per sq ft$0.024

Computed with the same formulas as the free calculators on this site. Change any input in the calculator above to see your own numbers.

3,000 sq ft post construction clean, all phases (assumed inputs)
LineCleaner-hoursBreak-evenPrice
Rough clean6$249.90$384.46
Final clean12$424.80$653.54
Touch-up2$73.30$112.77
Subtotal20$748.00$1,150.77
Drive: 3 trips × 2 cleaners × 0.5 hours3$94.95$146.08
Job total23$842.95$1,296.85

With drive included the job works out to $0.43 per sq ft. Profit before drive is $402.77 on the three phases.

Try it with your numbers — free

The free calculator does this whole method in about a minute: loaded labour, overhead share, break-even and the price to quote at your margin. No signup, nothing to download, and your numbers stay in your browser.

Open the free cleaning pricing calculator →Get the free spreadsheet

Want it built around your own rates, services and branding? Done-for-you custom calculator ($497).

Construction cleanup cost per square foot, phase by phase

Construction cleanup cost per square foot is an output of the phase hours, not a rate to start from. Each phase has its own per-sq-ft figure because each goes at its own speed; the final clean costs the most per foot.

Price per sq ft for each phase, by floor area (same assumed rates and supplies, drive excluded)
Floor areaRough cleanFinal cleanTouch-upAll three
2,000 sq ft$287.08 ($0.144)$458.77 ($0.229)$80.31 ($0.040)$826.16 ($0.413)
3,000 sq ft$384.46 ($0.128)$653.54 ($0.218)$112.77 ($0.038)$1,150.77 ($0.384)
5,000 sq ft$579.23 ($0.116)$1,043.08 ($0.209)$177.69 ($0.036)$1,800.00 ($0.360)
10,000 sq ft$1,066.15 ($0.107)$2,016.92 ($0.202)$340.00 ($0.034)$3,423.07 ($0.342)

Use the phase columns when a builder only wants part of the job, for example a final clean and touch-up after their own crew did the rough clean. On the 3,000 sq ft home that is $653.54 + $112.77 = $766.31.

The totals on their own, with the cleaner-hours behind them:

Three phases at the same assumed rates, by floor area (drive time excluded)
Floor areaCleaner-hoursJob pricePer sq ft
2,000 sq ft13.33$826.16$0.41
3,000 sq ft20$1,150.77$0.38
5,000 sq ft33.33$1,800.00$0.36
10,000 sq ft66.67$3,423.07$0.34

The per-sq-ft figure drifts down as area grows because supplies are a fixed amount per phase in this sheet. On a real commercial fit-out the rates themselves change: open warehouse floor goes faster than a home full of cabinets, so time it rather than scaling a house rate.

Per hour, the 3,000 sq ft job bills $57.54 per cleaner-hour including supplies. That is an output too. If you only quote hourly, set a minimum number of hours, because a builder cannot compare an open-ended hourly quote with a fixed one.

New construction cleaning prices vs renovation cleanup

Price them with the same phases but different rates. A new build is empty, so the crew moves fast once debris is out. A renovation clean usually happens in a home with furniture, finished rooms next to the work area and dust that has drifted through the house, so the final clean goes slower.

As an assumption, drop the final-clean rate on the 3,000 sq ft example from 250 to 200 sq ft per cleaner-hour for a renovation. Final-clean hours go from 12 to 15 and that phase prices at $799.62 instead of $653.54. Nothing else changes, which is the point: the extra cost is hours, not a percentage you guess.

Same 3,000 sq ft, final clean only (assumed rates)
Job typeSq ft per cleaner-hourCleaner-hoursFinal clean price
New construction25012$653.54
Renovation20015$799.62

Ask before you quote whether the home will be lived in, whether floors and furniture are covered, and whether you clean only the work area or the whole house. Each answer changes the hours.

Why you cannot price it like a recurring clean

A recurring clean assumes the place is already clean. A builder's clean starts from dust, stickers and debris, so it runs far slower, and it happens once, so there is no month of repeat visits to average out a bad estimate.

Quote the same 3,000 sq ft home as one standard visit at the recurring placeholder of 500 sq ft per cleaner-hour used in the house cleaning pricing guide, with $8 of supplies, and it prices at $304.46. The phase method says $1,150.77. The gap is the final clean and the extra trips.

Two other differences:

If the builder likes the work and asks for regular cleaning of a finished office or show homes, that is a recurring contract, priced per visit and per month. The cleaning contract pricing calculator ($39) is built for that part.

Is post construction cleaning profitable? The overrun test

It is profitable only if your hours hold. On this example the three phases earn $402.77. Let the final clean run 4 cleaner-hours over and profit falls to $276.17, because each extra hour costs $31.65 in loaded labour and overhead.

That is 4 × ($23.40 + $8.25) = $126.60 off the job. Two common causes: the builder is not finished when you arrive, and trades come back after your final clean. Put both in writing:

The other profit leak is margin maths. Adding 35% to the break-even of the three phases bills $1,009.81, which is $140.96 under the margin price. The markup vs margin guide explains why.

Free calculator, spreadsheet or custom build?

For one builder's job, the free calculator run once per phase is enough. For a saved price sheet you reuse on every bid, use a spreadsheet.

Ways to price a post construction clean
OptionCostSuits
Free cleaning job price calculatorFree, no signupOne phase at a time
Free Job Pricing StarterFreeLoaded labour, overhead, break-even and price at your margin on one sheet, one job at a time
Cleaning Contract Pricing Calculator$39 one-timeRecurring contracts after the build, per visit and per month
Done-for-you custom build$497 one-timeYour own phase rows, rates and a branded quote page

There is no ready-made post construction template in the store. The Job Pricing Starter handles the arithmetic of each phase; a custom build can lay out all three phases and the drive line on one quote.

What to put in your post construction cleaning price sheet

One row per phase, a drive line, a debris line if you haul, and a minimum. Layout: B2 = sq ft, B3 = phase production rate, B4 = wage, B5 = burden %, B6 = phase supplies, B7 = yearly overhead, B8 = people in the field, B9 = billable days, B10 = margin %.

Cleaner-hours for a phase

=B2/B3

B2 = sq ft, B3 = sq ft per cleaner-hour for this phase.

Price for a phase

=(B2/B3*B4*(1+B5)+B6+B2/B3*B7/(B8*B9*8))/(1-B10)

Loaded labour + supplies + overhead share, divided by (1 − margin). One row per phase.

Job total

=SUM(C2:C4)+C5

C2:C4 = the three phase prices, C5 = the priced drive line.

Price per sq ft (check only)

=ROUND(C6/B2,2)

C6 = job total. Compare, do not quote from it.

Step-by-step: Post Construction Cleaning Pricing: Price Each Phase From Its Hours

  1. Walk the site. Measure the floor area, note the stage of work, surfaces, windows, cabinets and debris, and confirm which phases the builder wants.
  2. Set a rate for each phase. Choose sq ft per cleaner-hour for rough, final and touch-up separately, ideally from timing your own jobs.
  3. Price each phase. Cleaner-hours × loaded rate + supplies + cleaner-hours × overhead per sellable hour = break-even. Divide by (1 − margin).
  4. Add drive and debris. Add drive hours for every trip and every cleaner, and a separate line for any debris haul-away.
  5. Check the total. Divide the job price by square feet as a sanity check and compare with your minimum charge.
  6. Write the quote. List each phase with its price, start conditions, the return-visit rate and payment terms.

Run your own numbers — free

The free calculator does this whole method in about a minute: loaded labour, overhead share, break-even and the price to quote at your margin. No signup, nothing to download, and your numbers stay in your browser.

Open the free calculator →Get the free spreadsheet

Want it built around your own rates, services and branding? Done-for-you custom calculator ($497).

Frequently asked questions

How much should I charge for post construction cleaning?

Price each phase from its hours and add them. On this page's assumptions a 3,000 sq ft new build is 20 cleaner-hours across rough, final and touch-up and prices at $1,150.77, or $1,296.85 with drive time for a crew of two. Replace the rates and costs with your own.

How much does construction cleanup cost per square foot?

Work it out after pricing the hours. On this page's assumptions a 3,000 sq ft new build comes to $0.38 per sq ft for all three phases before drive and $0.43 with it. The final clean alone is about $0.22 per sq ft, the rough clean $0.13 and the touch-up $0.04.

Are new construction cleaning prices different from renovation cleanup?

Yes, through the hours. Use the same phases but a slower final-clean rate when people live in the home or dust has spread. Dropping the assumed final-clean rate from 250 to 200 sq ft per cleaner-hour on a 3,000 sq ft home raises that phase from $653.54 to $799.62.

How do you quote a post-construction clean?

Walk the site, split the work into rough, final and touch-up phases, price each from its own production rate, add drive and any debris haul-away, then write a quote with start conditions, a return-visit rate and payment per phase.

How much should I charge per hour for construction cleaning?

Start from your floor. With an $18 wage, 30% burden and $8.25 of overhead per hour, break-even is $31.65 per cleaner-hour and a 35% margin needs $48.69 before supplies. Quote hourly only with a minimum, since builders compare fixed prices.

Is post-construction cleaning profitable?

Only if your hours hold. The 3,000 sq ft example earns $402.77 across three phases. If the final clean runs 4 cleaner-hours over, profit falls to $276.17. Write start conditions and a return-visit rate into the quote to protect it.

What does a construction cleanup consist of?

Usually a rough clean after the main trades finish, a detailed final clean before handover, and a touch-up after the punch list. Each is a separate trip with its own speed, so price them as separate lines.

Is there a post construction cleaning calculator?

Yes. The free cleaning job price calculator on this site prices one phase from area, production rate, wage, supplies, overhead and margin, with no signup. Run it once for each phase and add the three prices, plus drive.

Roger Ramey
By Roger Ramey
I'm not a contractor, landlord or accountant. I build the pricing maths, and every number on this page shows its working so you can check it instead of trusting it. Guides are drafted with AI assistance; every worked figure is computed by the same code as the free calculators. How these guides are made → · Watch the breakdowns on YouTube →