ProSheet Studio

How to Bid a Painting Job: Measure, Hours, Paint, Overhead, Margin

By Roger Ramey· Updated · 8 min read· Every number shows its working

Short answer

To bid a painting job, measure the paintable area, divide by your production rate to get hours, cost those hours at your loaded labour rate, add paint (area × coats ÷ coverage), sundries and an overhead share, then divide by (1 − margin). A 12 × 14 bedroom at 10.56 hours and $210.00 of materials prices at $985.11.

On this page
  1. What's the best way to bid a painting job?
  2. How do painters estimate a job? Start by measuring
  3. How to calculate painting hours from production rates
  4. How much paint does a room (or a house) take?
  5. Worked example: bidding a 12 × 14 bedroom
  6. How much should I charge to paint a 12 × 12 or a 20 × 20 room?
  7. The bidding mistake: markup instead of margin
  8. Interior vs exterior and commercial bids
  9. How to give a painting estimate the customer can say yes to
  10. Step-by-step
  11. FAQ

What's the best way to bid a painting job?

Bid from the hours the job will take and what those hours cost you. Measure, turn area into hours with a production rate, cost the hours at your loaded rate, add paint and overhead, and price on margin. Every step is arithmetic you can check.

The seven numbers behind every paint bid
InputWhere it comes from
Paintable areaTape measure: walls, ceilings, trim, doors
CoatsColour change, surface condition, product label
Production rateYour own timed jobs (sq ft per hour per coat)
CoverageThe product's data sheet or label
Loaded labour rateWage × (1 + burden %)
Overhead per hourYearly overhead ÷ sellable hours
Target marginYour choice; 35% in these examples

I'm not a painter — I build the pricing math. That is why every figure on this page is an input you replace, not a going rate. For how the per-square-foot number falls out of this method, see painting price per square foot.

How do painters estimate a job? Start by measuring

Measure every surface you will paint and convert it to square feet: walls are perimeter × height, ceilings are length × width, less openings. Coats multiply the area you actually roll.

Measuring the example 12 × 14 room (8 ft walls)
SurfaceFormulaResult (sq ft)
Walls, gross2 × (12 + 14) × 8416
Less 1 door20 sq ft (assumption)−20
Less 2 windows15 sq ft each (assumption)−30
Walls, net366
Walls × 2 coatsnet × 2732
Ceiling, 1 coat12 × 14168

Door and window allowances are assumptions; measure the real openings on unusual rooms. Trim, doors and cabinets are better priced as separate line items (per door, per linear foot of trim) using the same hours-based method. Try the room in the calculator — enter hours and materials and it returns break-even and the price to quote.

How to calculate painting hours from production rates

Hours = area × coats ÷ production rate, plus fixed allowances for set-up, prep and clean-up. The production rate is the one number you must measure yourself: time two or three jobs and divide square feet by hours.

Hours for the 12 × 14 room (production rates are assumptions — use your own)
TaskWorkingHours
Set-up, move furniture, maskflat allowance1.5
Patch, sand, caulkflat allowance1.5
Walls, 2 coats732 ÷ 150 sq ft/hr4.88
Ceiling, 1 coat168 ÷ 100 sq ft/hr1.68
Clean-upflat allowance1.0
Total10.56

The 150 and 100 sq ft per hour rates above are placeholder assumptions for one painter rolling and cutting in — replace them with your own measured rates. A faster painter bids lower and still keeps the same margin; a slower one who copies a fast painter's rate works for less than break-even.

How much paint does a room (or a house) take?

Gallons = area × coats ÷ coverage per gallon, rounded up to what you can buy. Sherwin-Williams says a gallon typically covers about 350–400 square feet; the examples use 350, the cautious end.

Paint and materials for the 12 × 14 room
ItemWorkingCost
Wall paint732 ÷ 350 = 2.09 gal → buy 3 × $45$135
Ceiling paint168 ÷ 350 = 0.48 gal → buy 1 × $35$35
Sundriestape, plastic, caulk, filler, roller covers (assumption)$40
Materials total$210

Paint prices and sundries are assumptions. For a whole house the method is the same: add up every room's net wall and ceiling area, then divide. A house's floor area does not tell you its wall area, so there is no honest one-line answer to “how much paint for a 2,000 sq ft house” without measuring. As a check on scale, 1,000 sq ft of wall at 2 coats needs 2,000 ÷ 350 = 5.71 gallons.

Worked example: bidding a 12 × 14 bedroom

Put the hours and materials into the job formula. The painter is paid $25 an hour with 30% burden (payroll tax, workers' comp, insurance, time off — an assumption), so labour costs $32.50 an hour, not $25.

Worked example: 12 × 14 bedroom, walls 2 coats + ceiling 1 coat, one painter (all inputs are assumptions)

Inputs (assumptions — replace with your own) and results
ItemValue
Workers (input)1
Hourly wage paid (input)$25.00
Labour burden % (input)30%
Materials (input)$210.00
Overhead for the year (input)$14,520.00
People in the field (input)1
Billable days a year (input)220
Target margin % (input)35%
Jobs a week (input)3
Hours on the job (input)10.56
Loaded labour rate (per hour)$32.50
Crew-hours10.56
Labour cost$343.20
Overhead per sellable hour$8.25
Overhead share$87.12
Break-even cost$640.32
Price to quote$985.11
Profit on the job$344.79
Price if you MARK UP instead$864.43
Margin you actually keep with markup25.93%
Lost per job by marking up$120.68
Lost per year by marking up$18,825.41

Computed with the same formulas as the free calculators on this site. Change any input in the calculator above to see your own numbers.

Overhead is $14,520 a year divided by 1 painter × 220 billable days × 8 hours = $8.25 per hour. Break-even is $343.20 + $210.00 + $87.12 = $640.32. The price is $640.32 ÷ (1 − 0.35) = $985.11, leaving $344.79 of profit.

The painting estimate calculator template runs this same sequence per job and keeps each one, so you are not rebuilding the math on the back of a receipt.

How much should I charge to paint a 12 × 12 or a 20 × 20 room?

Run the same method; the answer depends on your rates, but with the assumptions above a 12 × 12 room prices at $886.41 and a 20 × 20 room at $1,441.08.

Three rooms priced the same way (same assumptions, 35% margin)
Room (8 ft walls)Net wall sq ftHoursMaterialsBreak-evenPrice to quote
12 × 12, 1 door, 1 window34910.09$165.00$576.17$886.41
12 × 14, 1 door, 2 windows36610.56$210.00$640.32$985.11
20 × 20, 1 door, 2 windows59015.87$290.00$936.70$1,441.08

Worked example: 12 × 12 room, same method and rates

Inputs (assumptions — replace with your own) and results
ItemValue
Workers (input)1
Hourly wage paid (input)$25.00
Labour burden % (input)30%
Materials (input)$165.00
Overhead for the year (input)$14,520.00
People in the field (input)1
Billable days a year (input)220
Target margin % (input)35%
Jobs a week (input)3
Hours on the job (input)10.09
Loaded labour rate (per hour)$32.50
Crew-hours10.09
Labour cost$327.93
Overhead per sellable hour$8.25
Overhead share$83.24
Break-even cost$576.17
Price to quote$886.41
Profit on the job$310.24
Price if you MARK UP instead$777.83
Margin you actually keep with markup25.93%
Lost per job by marking up$108.59
Lost per year by marking up$16,939.32

Computed with the same formulas as the free calculators on this site. Change any input in the calculator above to see your own numbers.

Worked example: 20 × 20 room, same method and rates

Inputs (assumptions — replace with your own) and results
ItemValue
Workers (input)1
Hourly wage paid (input)$25.00
Labour burden % (input)30%
Materials (input)$290.00
Overhead for the year (input)$14,520.00
People in the field (input)1
Billable days a year (input)220
Target margin % (input)35%
Jobs a week (input)3
Hours on the job (input)15.87
Loaded labour rate (per hour)$32.50
Crew-hours15.87
Labour cost$515.78
Overhead per sellable hour$8.25
Overhead share$130.93
Break-even cost$936.70
Price to quote$1,441.08
Profit on the job$504.38
Price if you MARK UP instead$1,264.55
Margin you actually keep with markup25.93%
Lost per job by marking up$176.53
Lost per year by marking up$27,539.05

Computed with the same formulas as the free calculators on this site. Change any input in the calculator above to see your own numbers.

Notice the 12 × 12 room is barely cheaper than the 12 × 14. Four hours of set-up, prep and clean-up are the same in both. This is why small rooms priced at a flat per-square-foot rate lose money and large open rooms can look expensive — the fixed hours are spread over different areas. If you bid a 1,000 sq ft wall job with the per-square-foot guide's 60 sq ft/hr all-in rate, it comes to $1,567.95.

The bidding mistake: markup instead of margin

Adding 35% to your cost does not give you a 35% margin. Markup multiplies cost; margin divides it. The difference comes straight out of profit.

On the 12 × 14 room, break-even $640.32 × 1.35 = $864.43. Priced on margin it is $985.11. The markup bid is $120.68 lower and keeps 25.93%, not 35%. At three rooms a week that is $18,825.41 a year. The markup vs margin calculator shows the conversion for any percentage.

Painting Estimate & Profit Calculator

The spreadsheet version of this guide for Excel & Google Sheets: type your numbers into the highlighted cells and the formulas do the rest. One-time $14.99, no subscription, instant download.

See the Painting Estimate & Profit Calculator →Buy now — $14.99All 7 templates — $49

Instant access by email after checkout via Payhip. Want to try the maths first? Use the free calculator — no signup.

The second common miss is costing labour at the wage. Hours at $25 instead of $32.50 leaves out burden on every hour you bid.

Interior vs exterior and commercial bids

The formula does not change; the inputs do. Exterior and commercial bids swap in different production rates, access costs and risk allowances.

How to give a painting estimate the customer can say yes to

Keep two documents: an internal sheet with your costs and a customer bid with scope and price. The customer sees what is included, not your break-even.

Ways to produce the numbers
ToolCostBest for
Pen and paperFreeOne-off jobs, if you trust your arithmetic
Free painting estimate calculatorFree, no signupOne job at a time in the browser
Painting estimate template$14.99 one-timeSaving every job in Excel or Google Sheets
Estimating softwareUsually a subscriptionLarger crews with scheduling and CRM needs

If you want the template side of this, the painting estimate template guide covers what the spreadsheet should contain.

Net wall area

=2*(B2+B3)*B4-B5*20-B6*15

B2 = length, B3 = width, B4 = wall height (ft), B5 = doors, B6 = windows. 20 and 15 are allowance assumptions.

Gallons to buy

=ROUNDUP(B7*B8/B9,0)

B7 = area, B8 = coats, B9 = coverage per gallon from the label.

Hours

=B7*B8/B10+B11

B10 = your production rate (sq ft per hour per coat), B11 = set-up + prep + clean-up hours.

Break-even

=B12*B13*(1+B14)+B15+B12*B16/(B17*B18*8)

B12 = hours, B13 = wage, B14 = burden (0.30), B15 = materials, B16 = overhead a year, B17 = painters, B18 = billable days.

Price on margin

=B19/(1-B20)

B19 = break-even, B20 = target margin as a decimal (0.35).

Step-by-step: How to Bid a Painting Job: Measure, Hours, Paint, Overhead, Margin

  1. Measure every surface. Walls = perimeter × height less doors and windows; ceilings = length × width. Multiply by coats.
  2. Convert area to hours. Divide coated area by your measured production rate, then add set-up, prep and clean-up hours.
  3. Work out paint. Gallons = area × coats ÷ coverage per gallon, rounded up. Add sundries.
  4. Cost the labour. Hours × wage × (1 + burden %). Use the loaded rate, never the bare wage.
  5. Add overhead. Hours × (yearly overhead ÷ sellable hours). Break-even = labour + materials + overhead.
  6. Price on margin. Price = break-even ÷ (1 − target margin). Check it against the markup number.

Skip the setup: Painting Estimate & Profit Calculator

The spreadsheet version of this guide for Excel & Google Sheets: type your numbers into the highlighted cells and the formulas do the rest. One-time $14.99, no subscription, instant download.

See the Painting Estimate & Profit Calculator →Buy now — $14.99All 7 templates — $49

Instant access by email after checkout via Payhip. Want to try the maths first? Use the free calculator — no signup.

Frequently asked questions

How do you calculate a painting estimate?

Measure the area, multiply by coats, divide by your production rate for hours, and cost those hours at your loaded labour rate. Add paint (area × coats ÷ coverage), sundries and an overhead share per hour. Divide that break-even by one minus your target margin to get the price.

How much would a painter charge to paint a 12 × 12 room?

It depends on the painter's rates, but with the assumptions on this page — $25 wage, 30% burden, 150 sq ft per hour per coat, 35% margin — a 12 × 12 room with walls and ceiling prices at $886.41. Put your own rates into the free calculator for your number.

How much should I charge to paint a 20 × 20 room?

Using the same assumptions, a 20 × 20 room with 8 ft walls, two wall coats and one ceiling coat prices at $1,441.08 on a break-even of $936.70. Change the production rate or wage and the price moves, which is why copying someone else's number is risky.

How much should it cost to paint 1,000 square feet?

With an all-in rate of 60 finished square feet per hour, $340 of materials and the same labour and overhead assumptions, 1,000 sq ft of wall prices at $1,567.95. Your production rate moves this more than anything else; measure it on your own jobs.

How much paint does it take to paint a 2,000 sq ft house?

It depends on the wall and ceiling area, not the floor area. Measure each room, add the surfaces, multiply by coats and divide by the coverage on the label. At 350 sq ft per gallon, every 1,000 sq ft of wall at two coats needs about 5.71 gallons.

How do handymen estimate painting jobs?

The same way painters do: measure, estimate hours from a production rate, cost the hours at a loaded rate, add paint and overhead, and price on margin. Handymen often need a minimum charge, because set-up and clean-up hours make small jobs cost more per square foot.

What is the best way to quote a painting job?

Quote from your own costs and hours, in writing, with scope per room, prep included, products, exclusions and payment terms. Keep your break-even on an internal sheet. Price on margin, not markup, so the profit you planned is the profit you keep.

Sources

Roger Ramey
Written by Roger Ramey
I'm not a contractor, landlord or accountant. I build the pricing maths, and every number on this page shows its working so you can check it instead of trusting it. Watch the breakdowns on YouTube →
ProSheet Studio · Templates · Guides · Free calculators · Free spreadsheet · Custom build · Privacy
Pricing maths and templates, not financial, tax or legal advice. Calculators run in your browser; the numbers you type are never sent anywhere.